Early Engagement

Bring Wallmark into your project during feasibility and early design to shape a noise wall solution around the acoustic requirements, site conditions and wider project before key decisions are locked in.

Get the noise wall working with the project from the start.

Noise walls rarely sit in isolation.

They interact with site levels, foundations, drainage, underground services, access roads, equipment, retaining structures, landscaping and other infrastructure. Decisions made in one area can directly influence what is possible somewhere else.

Early engagement gives Wallmark the opportunity to work alongside the project team while those elements are still being developed — bringing acoustic barrier, structural and construction knowledge into the decisions that shape the final solution.

The result is a noise wall that is better coordinated with the site, practical to construct and planned around how the wider project will be delivered.

DISCUSS YOUR PROJECT →
Completed noise wall at an urban development project in Melbourne.

Shape the solution before it is locked in.

Early engagement gives the project team the opportunity to investigate different approaches before committing to detailed design.

Wallmark can develop and compare barrier configurations, foundation concepts, structural systems, materials and construction methodologies against the acoustic requirements, site conditions and project priorities.

This is also the point to test opportunities for value engineering — whether a change in alignment could simplify foundations, a different structural approach could improve efficiency, or retaining and acoustic requirements could be combined within a single footprint.

The objective is to give the project team clear options, with a better understanding of their cost and delivery implications.

Noise wall integrated with landscaping and surrounding site infrastructure.

Key project interfaces to consider early

SITE LAYOUT & LEVELS
Barrier position, geometry, finished levels, equipment and available space.

DRAINAGE & SERVICES
Stormwater, underground services, cable corridors, crossings and required clearances.

RETAINING STRUCTURES
Opportunities to coordinate retaining and acoustic requirements within the same area.

FOUNDATIONS & GROUND CONDITIONS
Geotechnical conditions, structural requirements, footing concepts and construction methodology.

ACCESS & OPERATIONS
Gates, removable sections, maintenance access, vehicle movements and operational requirements.

CONSTRUCTION STAGING
Earthworks, civil construction, equipment delivery, manufacture and installation sequencing.

Support at the right stage.

Wallmark can contribute wherever the project currently sits, from an initial acoustic requirement through to a developed concept ready to progress into detailed design.

  • Feasibility support
  • Concept design and development
  • Preliminary engineering
  • Value engineering
  • Budget estimating
  • Constructability reviews
  • Design coordination
  • Delivery methodology advice
  • Programme planning
  • Authority coordination

Engagement can be tailored to the information available and the decisions the project team needs to make.

Bring Wallmark in early.

If your project has an acoustic requirement and the design is still taking shape, this is the time to talk to us.

TALK TO OUR TEAM
Wallmark noise wall installed alongside major road infrastructure.

View our work

Take a deep dive into our projects

Early Engagement FAQs

Wallmark can become involved during feasibility, concept development or preliminary design, while there is still flexibility to influence the noise wall solution and how it integrates with the wider project.

Early engagement can begin with an acoustic report, concept drawings, preliminary site layouts, geotechnical information or other available project documentation. The level of input can develop as more project information becomes available.

Wallmark can provide feasibility support, concept development, preliminary engineering, constructability reviews, value engineering, budget estimating, design coordination, delivery methodology advice and programme planning.

Yes. The acoustic consultant typically establishes the required acoustic performance. Wallmark can work with the consultant and wider design team to develop the physical barrier solution around those requirements.

Yes. Wallmark can provide budget estimating during the early stages of a project and refine pricing as the barrier design, quantities and site requirements become more defined.

Foundation concepts can be considered during early engagement using the available structural, geotechnical and site information. Detailed foundation engineering can then progress as the project and design develop.

Yes. Wallmark can review an existing concept or preliminary design for constructability, structural approach, materials, foundations and potential value-engineering opportunities before it progresses further.

Wallmark can continue through detailed design, engineering, manufacture, construction and certification, providing continuity from the early concept through to the completed noise wall.