Battery Energy Storage System (BESS) acoustic barrier designs can meet every requirement on paper but still create unnecessary cost, redesign and delays during construction.
Wallmark Sales Director Brad Hewines said the problem often came down to designing without the bigger picture in mind.
“Achieving the required acoustic outcome is critical, but that’s just one part of the equation,” Brad said.
“Issues can start at specification, with the wrong materials being designed into the project.”
“A barrier that suits a highway noise mitigation project won’t necessarily suit a BESS.”
Acoustic barriers for BESS projects may either be absorptive or reflective, depending on location, site and nearby residents.
“Once the scope for a renewable energy project is locked in, we can assist with an end-to-end acoustic barrier solution,” Brad said.
“That bigger picture overview has enabled us to create hybrid acoustic and retaining barrier solutions, like we did on the Supernode project in Brisbane.”
When one provider delivers design, engineering, construction and certification, construction knowledge informs design from the outset.
That means designing around proven construction methodology, manufacturing capability and installation requirements, not making assumptions about how someone else will deliver a project.
According to Brad, seemingly minor design decisions can have significant implications once construction begins.
“We’ve seen projects where foundations conflict with underground services, where installation sequencing hasn’t been considered, or where access for cranes and piling equipment becomes much more difficult than anticipated.
“None of those issues are acoustic problems, but they all affect whether the project can be delivered efficiently.”
There’s the added benefit of working with one provider throughout all project stages.
“Instead of coordinating multiple consultants, manufacturers and contractors, there’s one accountable delivery partner from concept through to certification. Decisions happen faster, communication is simpler, and the design is developed with the whole project in mind.”