Hanson Concrete

Wallmark designs and constructs a stylish artistic solution for 6.5m high acoustic barrier

Problem

Hanson Concrete’s Perth Plant is the busiest in Australia. The local Council demanded the site be screened off for sound attenuation and visual aesthetics due to the fact it was on a high profile and busy intersection.

Solution

Wallmark provided both a visual and acoustic screen incorporating tree features to replicate the artists impression thus solving all issues in one transaction - 6.5 m high x 70 meters long Dune wall bolt down and custom made to site requirements.

Key Advantages

  • Can be engineered to very high walls
  • Certified results for Government Departments
  • Wallmark can organize project extras
  • Patented systems allows front loading of panels, ensuring maximum safety on building sites
Download Case Study